I’m a systems thinker and hands-on product designer who loves turning complex workflows into clear, thoughtful experiences.

I’ve collaborated with global teams of all sizes, both as an IC and within large UX orgs. Whether it’s big-picture strategy, hands-on design, research, journey mapping, or design systems, I adapt to what’s needed and dive in.

Featured projects
Workday

Improved Large-Scale Hiring with AI-Powered Solutions (NDA)

Led AI recruiting solutions for shift-based, high-volume hiring, aligning UX with product, engineering, and research.

Timeline

8 months

Team

0.25x UX Teammate

4x PM’s

6x Devs

1x Researcher

Role

Sr. Product Designer

Impact

Rate 4/5 – Easier for candidates to share availability

Rate 4/5 – Easier for candidates to share availability

Delivered a clear blueprint for integrating AI

Constraints

Quick shifts in direction

4 PM changes

Legacy tech stack limitations

Old tech stack limitations

Timeline

8 months

Team

0.25x UX Teammate

4x PM’s

6x Devs

1x Researcher

Role

Sr. Product Designer

Impact

Rate 4/5 – Easier for candidates to share availability

Rate 4/5 – Easier for candidates to share availability

Delivered a clear blueprint for integrating AI

Constraints

Quick shifts in direction

4 PM changes

Legacy tech stack limitations

Old tech stack limitations

Avitas

Leveraging AI & Robotics to Rebuild an Industrial Inspection Platform, boosting sales prospects by 35%

Redesigned a complex system into a scalable, user-friendly platform that improved inspector workflows and efficiency.

Timeline

12 months

Impact

Increase development efficiency by 40%

boosting sales prospects by 35%

Role

Senior Staff UX Designer

Team

.5x UX Teammate

6x PM’s

2x Executives

4x Data Scientists

2x Inspectors

20x Backend & Frontend devs

Constraints

Limited design resources

ad-hoc POCs

Simultaneous ad-hoc POCs support

Timeline

12 months

Impact

Increase development efficiency by 40%

boosting sales prospects by 35%

Role

Senior Staff UX Designer

Team

.5x UX Teammate

6x PM’s

2x Executives

4x Data Scientists

2x Inspectors

20x Backend & Frontend devs

Constraints

Limited design resources

ad-hoc POCs

Simultaneous ad-hoc POCs support

Cisco

Modernizing Cloud Network Management for Scalability & 3× Increase in Adoption

Redesigned Cisco's legacy network platform and design system, leading art direction, branding, and system strategy.

Redesigned Cisco's legacy network platform and design system, leading art direction, branding, and system strategy.

Timeline

11 months

Impact

Increase development efficiency by 40%

boosting sales prospects by 35%

Role

Visual Design Manager

Team

7x Visual Designers

3x Interaction Designers

1x Engineering Manager

4x Engineering Leads

1x PM

1x Marketing Team Lead

3x UX Team Lead

Constraints

Tight timeline

ad-hoc POCs

Timeline

11 months

Impact

Increase development efficiency by 40%

boosting sales prospects by 35%

Role

Visual Design Manager

Team

7x Visual Designers

3x Interaction Designers

1x Engineering Manager

4x Engineering Leads

1x PM

1x Marketing Team Lead

3x UX Team Lead

Constraints

Tight timeline

ad-hoc POCs

Other Work
GE Digital

Building the Next-Gen Plant Advisory System for Real-Time Monitoring

I designed the Plant Operator’s Advisory System, unifying data from 4-5 disparate systems to provide real-time insights that improved communication, reduced downtime, and enhanced operational efficiency.

Timeline

Aug 2016 - May 2017

Expected Impact

Improved real-time monitoring

Reduce downtime

Boosting efficiency

Role

Staff Designer

Team

1x Designer partner

3x PM’s

30x Backend & Frontend devs

Constraints

Directional shift

Scope increase

Timeline

Aug 2016 - May 2017

Expected Impact

Improved real-time monitoring

Reduce downtime

Boosting efficiency

Role

Staff Designer

Team

1x Designer partner

3x PM’s

30x Backend & Frontend devs

Constraints

Directional shift

Scope increase

Avitas, a Baker Hughes venture (acquired from General Electric)

Other Design and Artworks

I designed the Plant Operator’s Advisory System, unifying data from 4-5 disparate systems to provide real-time insights that improved communication, reduced downtime, and enhanced operational efficiency.

Timeline

Various time

Role

FTF & Freelancer

Timeline

Various time

Role

FTF & Freelancer